Reinforced cement concrete foundation with piles and pile cap/Suitable foundation as
per the soil test. RCC frame structure with solid block / brick partitions.
STRUCTURE
STRUCTURE
Reinforced cement concrete foundation with piles and pile cap/Suitable foundation as
per the soil test. RCC frame structure with solid block / brick partitions.
Entrance Lobby, Lounge, Lift Areas ( Marble, Granite or equivalent)
Foyer, Living, Dining, Bedrooms,Kitchen – Premium Vitrified tiles for each apartment.
(RAK or equivalent)
Work Area & Balcony - Anti skid / Rustic Designer Ceramic tiles Kajaria
Bed Room Toilets –Designer Anti-skid ceramic tile flooring (30X30) and glazed designer
tile concepts for walls (60X30) ( Kajaria/equivalent).
Sanitary fittings: EWC wall-hung (Kohler / CERA or equivalent)
Faucets: Single Lever Diverters CP finish for the all Bed Room toilets. Health faucet also
shall be provided for bedroom toilets. (Grohe/ Jaquar or Equivalent).
Provision for hot water connection shall be provided in each bathroom
Stainless Steel Sink single bowl with drain board of make FRANKE / NIRALI or equivalent
shall be provided
Provision for water purifier in Kitchen.
Provision for Washing machine in Work Area
SANITARY & PLUMBING
SANITARY & PLUMBING
Sanitary fittings: EWC wall-hung (Kohler / CERA or equivalent)
Faucets: Single Lever Diverters CP finish for the all Bed Room toilets. Health faucet also
shall be provided for bedroom toilets. (Grohe/ Jaquar or Equivalent).
Provision for hot water connection shall be provided in each bathroom
Stainless Steel Sink single bowl with drain board of make FRANKE / NIRALI or equivalent
shall be provided
Provision for water purifier in Kitchen.
Provision for Washing machine in Work Area
Doors: Pre Hung Veneered flush door of PU / Melamine finish.Front Door -Teak Veneer
Flush Door with grooves (not solid Teak Wood).
Hardware: Mortise locks of Yale / Dorset or equivalent.
Windows of UPVC / Powder coated aluminium with glazed shutters.
DOORS & WINDOWS
DOORS & WINDOWS
Doors: Pre Hung Veneered flush door of PU / Melamine finish.Front Door -Teak Veneer
Flush Door with grooves (not solid Teak Wood).
Hardware: Mortise locks of Yale / Dorset or equivalent.
Windows of UPVC / Powder coated aluminium with glazed shutters.
Concealed Three phase copper wiring with ISI marked superior quality PVC insulated
copper cables. (Finolex or Equivalent)
Modular switches, adequate light points, fan points, 6/16 ampere power plug points
controlled by ELCB and MCB. (Legrand / Schneider or equivalent)
Light fixtures shall be provided for the Common areas and external areas.
Geyser point and Exhaust fan point in all toilets inside apartment and kitchen.
Provision for telephone and internet shall be provided in the living room and master
bedroom.
Power backup will be provided for all common services. For individual apartments
backup shall be provided for all points (except A/C and Geyser).
ELECTRICAL
ELECTRICAL
Concealed Three phase copper wiring with ISI marked superior quality PVC insulated
copper cables. (Finolex or Equivalent)
Modular switches, adequate light points, fan points, 6/16 ampere power plug points
controlled by ELCB and MCB. (Legrand / Schneider or equivalent)
Light fixtures shall be provided for the Common areas and external areas.
Geyser point and Exhaust fan point in all toilets inside apartment and kitchen.
Provision for telephone and internet shall be provided in the living room and master
bedroom.
Power backup will be provided for all common services. For individual apartments
backup shall be provided for all points (except A/C and Geyser).
Acrylic/ Cement based putty with 2 coats of Premium Emulsion paint shall be applied
inside apartments.